Delta State, associated gas
Ughelli Modular Site
Evidence tier: In development4 of 9 done, next: permits granted in Q3 2027
Energy to compute, Nigeria
We are an energy company first. The group generates the power; Exusia Digital converts it into compute where the energy is, rather than where the grid happens to be strongest.
Who are you?
The raise, use of proceeds, the risk register and a data room under NDA.
GPU-dense capacity at African energy economics. Specifications and delivery dates.
Request capacityFlare gas or curtailed generation? We are a buyer. Screen your site in two minutes.
Screen my siteAll-in cost per kWh, curtailment terms and energisation dates, stated plainly.
Build a quoteCapacity tracker
Pipeline is not capacity. We show both, with the stage and the evidence behind each figure.
To be confirmed The split of the identified pipeline between stages is provisional until management confirms it.
As at August 2026. Updated with each model version. Method and sources on the assumptions page. The method
The number the category runs on
Everything else in this industry is downstream of this figure. Here is ours, and here is what it is competing against.
$0.042/kWh
Exusia Digital at Ughelli, on associated gas: fuel, O&M and generation capex recovery included.
As at August 2026. Financial model v3| Source | Range | US$ per kWh | Evidence tier |
|---|---|---|---|
| Exusia Digital, Ughelli | 0.042 | Evidence tier: Modelled | |
| Nigerian grid, industrial | 0.09 to 0.13 | Evidence tier: Illustrative | |
| Diesel generation, Lagos | 0.28 to 0.35 | Evidence tier: Illustrative | |
| US merchant power, ERCOT | 0.03 to 0.05 | Evidence tier: Illustrative |
US dollars per kWh. Comparators are illustrative ranges. We publish the comparison least flattering to us (ERCOT) because an investor will find it anyway.
What we are building
Including the two that are early. A portfolio you can see the shape of is worth more than three projects that all claim to be imminent.
Delta State, associated gas
4 of 9 done, next: permits granted in Q3 2027
Lagos, group-owned gas generation
1 of 9 done, next: energy source agreed
Location to be confirmed
0 of 9 done, next: site identified
Why we exist
The next wave of computing is constrained by available power, not by silicon. Nigeria's grid has never exceeded roughly 6 GW for more than 200 million people, and the country flares gas that has no commercial route to market. Both of those facts are opportunities for a company that can put a load next to the generation.
What we have that others do not
Every other operator in this market buys power or fights the grid for it. We sit inside a group that generates it.
Power & Gas, Fossil Energy and Green. The energy we generate ourselves.
Modular compute sited on the generation.
AI labs, HPC operators, sovereign programmes, digital-asset clients.
| Energy source | Group-owned gas, fossil-energy assets, solar and storage |
|---|---|
| What Digital does | Converts that energy into AI, HPC and digital-asset compute capacity |
| Why it matters | Every competitor in this market is buying power or fighting the grid. We generate it. |
How to read this site
Signed agreement in place. The strongest evidence we publish.
Regulatory permit granted for this site or activity.
Work under way; dates are targets, not commitments.
Output of a financial or engineering model with stated assumptions.
Context only, such as market comparators.
For investors
We publish our risk register, our model assumptions and the evidence tier behind every number. An investment committee is going to build that list anyway; we would rather hand it over than have it assembled without us.